Project Description:
Jason was the Project Director for WDHB for the design and construction of the new Skybridge. The Skybridge connects the Elective Surgery Centre with the main hospital to provide patient transfers. Construction was carried out by NZ Strong who prefabricated the bridge sections off site before bring them to site to lift into the final positions.
Project Value $5.5m